Lenze L-force Serie Instructions De Montage page 29

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

How to connect the filter:
1. Connect filter input cable to terminals 1U1, 1V1, 1W1 and PE.
Connect filter output cable to terminals 1U2, 1V2, 1W2 and PE.
– Observe tightening torques!
– The PE connection must comply with EN 50178.
2. The shield must be connected with a large surface to the shield sheet (PES).
– Turn down the shield and fix it with cable binders .
– Alternative: Insert shield mounting kit E94AZJS007 (not included in the scope of
supply) and mount cable binders in addition for strain relief .
EDKZS3X200 DE/EN/FR/ES/IT 1.1
Electrical installation
Mounting steps
4
29

Publicité

Table des Matières
loading

Table des Matières