Led Status - Rosco Beyond RK350DT Instructions D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 11
Configure the BUS detector parameters:
Select Installer menu: [2] Zones > [1] Parameters > [2] By Category > [7] Advanced [4] BUS Zone
Parameters (see LightSYS / ProSYS Plus Installation Manual).
NOTE: For LightSYS Version 5.20 and above.
Step 7: Performing a Walk Test
The detector cover should be closed during the walk test. Apply power and wait at least two minutes for
the detector to stabilize. Upon detection the detector transmits a signal and the LEDs light-up. Walk
through the entire protected area and observe the LEDs to confirm full coverage (see LED Status).
Manually initiate a walk test:
Select User Menu: Maintenance > Walk Test > Select Full Walk Test or Quick Walk Test. The detector
remains in walk test mode until any key on the panel is pressed.

LED Status

LED
YELLOW
GREEN
RED
All LEDs
NOTE: DIP-SW 1 should be in ON position to enable LED indications.
Self-Test
Every hour the detector performs an internal self-test for both PIR and MW channels. A fault detected
in the self-test will be indicated by a momentary open anti-mask relay (in relay mode) or by a
corresponding message in the panel (in BUS mode).
Specifications
Electrical
Current consumption:
Power output
Voltage requirements
Alarm contacts
AM contacts
Tamper contacts
Physical
Size (LxWxD):
State
Blink ON
Steady ON
Flashing
Steady ON
Steady ON
Flashing
Flashing (One after another) Unit initialization on power up
30mA at 12 VDC (Stand by)
42mA at 12 VDC (MAX with LED ON)
16dBm
9 -16 VDC
24 VDC, 0.1A
24 VDC, 0.1A
24 VDC, 0.1A
176 x 89 x 107 mm (7 x 3.5 x 4.2 in)
Description
Indicates start of PIR detection analysis
Indicates PIR detection
Indicates Active IR AM (Anti mask) detection
Indicates MW detection
Indicates ALARM
Indicates malfunctioned communication with
the RISCO system (BUS Mode only)
7

Publicité

Table des Matières
loading

Table des Matières