Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Guide

WARNING: It is important that you read and carefully follow all foundation assembly instructions. Do not plug the power
cord into an electrical outlet until all assembly has been properly completed. Failure to follow all foundation assembly
instructions may cause the bed to operate improperly possibly resulting in the risk of personal injury or death.
NOTE: To avoid damage to the foundation,
always open the carton while the bed is in the flat
position.
STEP 1
Place the foundation box in a
desired location with the bottom
of the box facing up.
Remove the binding straps and
packing materials, making sure
not to puncture the box with any
sharp objects.
STEP 2
Remove the foundation from the box, keeping the bottom of the
foundation facing upward for easier access to the bed's components.
STEP 3
To install the legs, thread the
bolt of the leg to the nut on
the foundation frame, and
tighten by hand. DO NOT
OVERTIGHTEN.
STEP 4
Locate the power supply
and install (2) 9-volt batteries (not
included).
All manuals and user guides at all-guides.com
Two people are required to set up the foundation.
Customer Service Toll Free: 1 ( 800 ) 248-5988
—05—
STEP 5
Uncoil the input power cord
(connected to the control box's
power port) and plug it into the
power supply.
STEP 6
Uncoil the power cord and connect it to the
power supply.
STEP 7
Carefully flip the foundation over onto its legs.
Important: Two people are required to move the foundation.
Do not drag across the floor. Do not rest frame on its side;
excessive pressure may damage the legs.
STEP 8
Ensure that batteries are correctly installed
in the remote.
STEP 9
Locate the mattress retainer bar brackets.
Slide the left side of the mattress retainer bar into the bracket. Pull
the retainer bar to the opposite bracket and secure the right side.
STEP 10
Plug the foundation into a power source.

Publicité

Table des Matières
loading

Table des Matières