Cheminée Préfabriquée Extérieure; Raccord Positif Du Poêle Dans L'âtre - Avalon Olympic Guide D'utilisation

Table des Matières

Publicité

Installation du FIREPLACE INSERT(pour installateurs qualifiés seulement)
Cheminée
préfabriquée
extérieure
Raccord positif du
poêle dans l'âtre
© Travis Industries
Chimney Cap
(See the section "Chimney
Termination Requirements"
for more details)
Chimney Sections
Minimum Air Space to
Combustibles (See
Chimney Manufacturer's
Instructions - usually 2")
Min. 18"
clearance to
ceiling
Chimney Connector
Sections
Floor Protection
(See "Floor
Protection
Requirements"
for details)
NOTE: The entire fireplace and
chimney must be clean, undamaged,
and meet all local building codes
(UBC, etc.). Damage must be
repaired prior to installation. The
chimney must be 15' to 33' tall.
Combustible
Mantle
Floor Protection
(See the section
"Floor Protection
Requirements"
for more details)
Wall Bands
and
Supports
Stove Clearances
(See the section "Stove
Placement Requirements"
for more details)
Min. 18"
100-01166
Follow the chimney
manufacturer's
instructions and
clearances for roof
}
penetrations. A storm
collar and flashing are
required (some
require a radiation
shield).
Minimum 15'
Maximum 33'
Insulated Tee
(with cleanout )
Follow the chimney
manufacturer's
instructions and
clearances for wall
penetrations. A
wall radiation shield
(thimble) is
required.
Optional
insulated
chase
Cap and flashing
prevents water from
entering
The liner must be
stainless steel connector
or flexible vent. Follow
the liner manufacturer's
instructions for installation
and support.
Airtight Insulated
Clean-Out
Remove damper
or wire it open
See the section
"Stove Placement
Requirements" for
minimum clearances
required.
15
Figure 12
Figure 13
4040907

Publicité

Table des Matières
loading

Table des Matières