Installer Final Checklist; Gas Supply - DCS CDV2-365 Instructions D'installation

Table de cuisson suspendue
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLER FINAL CHECKLIST

14
US
CA
GENERAL
Placement of Unit.
o
Specified clearance maintained to cabinet surfaces.
o
Unit Level- front to back, side to side.
o
All packaging material and tie straps removed.
o
ELECTRICAL:
Receptacle with 15 ampere circuit protection is provided for service cord connection.
o
Adequate ground connection.
o

GAS SUPPLY:

Connection: 1/2" NPT flex line with a minimum 5/8" diameter.
o
The pressure regulator which is connected to the manifold is set for 4.0" W.C. for Natural Gas or 10" W.C.
o
for LP.
Manual gas shut-off valve installed in an accessible location.
o
Unit tested and free of gas leaks.
o
OPERATION:
All internal packing materials are removed, i.e. below grates, around knobs, etc.
o
Knobs turn freely and correctly.
o
Each burner lights satisfactorily, both individually and with other burners operating.
o
Low flame operation verified.
o
All burner caps, burner rings and burner bases correctly seated in position, level, and do not rock or slide.
o
Burner grates correctly positioned, level, and do not rock.
o
All manuals and user guides at all-guides.com

Publicité

Chapitres

Table des Matières
loading

Produits Connexes pour DCS CDV2-365

Ce manuel est également adapté pour:

Cdv2-304

Table des Matières