11.4 Power supply

The stations are supplied with electrical power from a power supply unit with an output voltage of
24 V DC (max. 5 A).
The entire station is supplied with electrical power from the rack PLC.

11.5 Loading the PLC program

Proceed as described in the user's manuals for the programming software used in order to load the PLC
program.
Current PLC programs for various controllers can be found on the Internet at the following website:
www.ip.festo-didactic.com

11.6 Starting the sequence

1. Check the power supply and compressed air supply.
2. Turn the key switch to the horizontal position (MAN).
3. Before resetting, manually remove the workpieces from the module and station transfer points.
4. Perform the resetting procedure. The resetting procedure is prompted by the lit-up RESET button and is
executed after the button has been pressed.
5. Turn the key switch to the vertical position (AUTO).
6. The LED on the start button lights up (the system is ready to start).
7. Press the start button.
8. Place a workpiece on the start of the conveyor.
9. The station starts the sequence.
Notes
The sequence can be stopped by pressing the emergency stop button at any time, or by
pressing the STOP button after the cycle.
The following applies when several stations are combined:
The individual stations are aligned in the order opposite the direction of material flow.