Before Starting; Cable Preparation - TE Connectivity Raychem EPP-0081-INT-7/10 Instructions De Montage

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 8

Before Starting

Check to ensure that the kit you are going to use
fi ts the cable.
Refer to the kit label and the title of the installation
instruction.
Components or working steps may have been
improved since you last installed this product.
Carefully read and follow the steps in the
installation instruction.
Legend
Item
Description
1
Reference line
2
Outer sleeve
3
Oversheath
4
Concentric neutral (if any)
5
Insulating sleeve

Cable Preparation

Overlap the cables to be jointed by about 150 mm. Slide the outer sleeve over one cable end.
Mark the reference-line (the middle of the overlap). Remove the oversheath (see drawing A) to the dimensions
A A
given in Table 1.
Shape and position the cores as shown in drawing A and cut them at the reference-line.
Completion of Joint
1 1
Slide the insulating sleeves over the long core ends.
Remove the insulation on all cores to dimension I = half length of connector + 5 mm.
2 2
Joint the conductors by crimping. Remove any sharp edges. Clean and degrease the insulation.
See Table 1 for maximum dimensions of connectors before installation.
Centre the insulating sleeves over the connectors. Shrink them into place starting in the centre and working towards
3 3
the ends.
Cables with concentric neutral:
Relay the cores as far as possible. Loosely twist the shielding wires together to make an earth conductor. Joint the
3-1
3-1
earth conductor by crimping, soldering or any other equivalent method.
Note: Take care not to break the shielding wires.
Wrap one layer of copper braid with a 50% overlap round the whole joint area.
Clean and degrease the ends of the oversheath for a length of about 150 mm.
4 4
Position the outer sleeve centrally over the joint and shrink it into place starting in the centre and working towards
the ends.
Joint complete.
Allow the joint to cool before applying any mechanical strain.
5 5
Please dispose of all waste according to environmental regulations.
The Information contained in these installation instructions is for use only by installers trained to make electrical power installations and is
intended to describe the correct method of installation for this product. However, TE Connectivity has no control over the fi eld conditions which
infl uence product installation.
It is the user's responsibility to determine the suitability of the installation method in the user's fi eld conditions. TE Connectivity's only obligations
are those in TE Connectivity's standard Conditions of Sale for this product and in no case will TE Connectivity be liable for any other incidental,
indirect or consequential damages arising from the use or misuse of the products.
Raychem, TE Connectivity and TE connectivity (logo) are trademarks.
© 2011 Tyco Electronics Raychem GmbH.
General Instruction
Use a propane (preferred) or butane gas torch. Ensure the torch is always used in a well-ventilated environment.
Adjust the torch to obtain a soft blue fl ame with a yellow tip. Pencil-like blue fl ames should be avoided.
Keep the torch aimed in the shrink direction to preheat the material. Keep the fl ame moving continuously to avoid
scorching the material.
Clean and degrease all parts that will come into contact with adhesive. If a solvent is used follow the
manufacturer's handling instructions.
Tubing should be cut smoothly with a sharp knife leaving no jagged edges. Start shrinking the tubing at the
position recommended in the instruction. Ensure that the tubing is shrunk smoothly all around before continuing
along the cable. Tubing should be smooth and wrinkle free with inner components clearly defi ned.
Table 1
Conductor
Oversheath
size
removal
a
(mm
)
(mm)
2
1.5 - 6
100
6 - 16
170
16 - 35
250
50 - 70
280
70 - 150
340
150 - 300
420
EPP-0081-INT-7/10 Page 3/19
Maximum dimensions for compression
connectors
b
Diameter
(mm)
(mm)
60
7
80
11
130
16
150
25
180
25
220
35
EN
Length
(mm)
35
50
85
105
125
145

Publicité

Table des Matières
loading

Table des Matières