FIRST OF ALL
The NIKE TL PUMPS are dosing systems controlled by a microprocessor with a display. Representing the jewel in the
crown of dosing systems and combining easy installation with a wide range of features, the NIKE TL PUMPS were
designed for laundry machines.
ð Dosing is timed from 0 to 999 minutes (timer)
- All settings are programmed using the keyboard on the front of the peristaltic pump.
Ü
Please read this manual carefully, paying particular attention to the warnings and cautions related to the
installation procedures. Always apply the necessary safety procedures, including the use of adequate personal
protective equipment for your face, eyes, hands and clothing.
I
:
Œ Check the package's contents, the technical characteristics and the operating principle.
 Carry out hydraulic, mechanical and electrical connections.
Ž Program the control parameters.
1
INSPECTIONS
1.1
POINTS TO INSPECT BEFORE INSTALLATION:
- Make sure all materials are provided.
- Make sure that the machine is compatible with the device's characteristics (voltage, pressure at injection points – max. 1
bar).
1.2

CONTENTS OF THE PACKAGE

Before starting work, make sure that the package contains the following:
Box complete with peristaltic pump
Fixing bracket with screws and wall plugs (1)
1.3

TECHNICAL CHARACTERISTICS

Power Supply: 100 - 240 VAC 50-60 Hz (24 VAC 50-60 Hz on demand)
Consumption: 5 W
Fuses: 400mA 250 VAC
Fuses: 1 A 250 Vac (for the version 24 Vac)
Pump flow rate: 15 l/h.
2 OPERATION
TL pump dosing is timed and provides easy user-friendly operation:
The pump is equipped with 2 cables:
Cable 1 is the fixed power cable (100 - 240 or 24 VAC).
Cable 2 receives a signal for enabling the dosing cycle (20-265 VAC).
Programming takes place through the keyboard and the display on the pump's front panel.

2.1 ELECTRICAL CONNECTIONS

Power the pump using cable 1, identified by the words POWER SUPPLY. When this cable is powered, the pump is
ON (if the switch is placed in the ON position)
Connect cable 2, identified by the word SIGNAL, to the signal that must start dosing.
Place the switch in the OFF position: The pump goes on standby. The display shows the message:
Proceed with programming using the keyboard, as described in chapter 3.
Place the switch in the ON position (the display will show the message:
NIKE TL
Cod. 0000136903 rev. 1.4
on
).
Page 1/4
Sby.