Télécharger Imprimer la page

Franke F5 Serie Notice De Montage Et De Mise En Service page 3

Mitigeur thermostatique mural

Publicité

Installation and operating
EN
instructions
Important notes
► Before installing flush piping system!
► Set the scald protection after assembly has
been completed.
► The fitting must be operated only with
original mesh filters and return flow
inhibitors!
► The fitting must be checked and
maintained at regular intervals depending
on the water quality and in accordance with
the local conditions, and rules and
regulations applicable at the site.
Technical data
► Minimum flow pressure 1.0 bar
► Maximum operating pressure 10 bar
► Recommended flow pressure 3 bar
► Volume flow at 3 bar flow pressure
6 l/min
► Thermostatic scald protection according to
DIN EN 1111
► maximum cold water temperature 15 °C
► minimum hot water temperature 60 °C
► maximum operating temperature
- continuous operation 70 °C
- short-term (<10 min) 80 °C
DE
Montage- und Betriebsanleitung
Wichtige Hinweise
► Vor Installation Rohrleitungen spülen!
► Nach erfolgter Montage den
Verbrühungsschutz einstellen.
► Armatur nur mit original Sieben und
Rückflussverhinderern betreiben!
► In Abhängigkeit von der Wasserqualität,
den örtlichen Gegebenheiten und den vor
Ort geltenden Bestimmungen die Armatur
in regelmäßigen Abständen prüfen und
warten.
Technische Daten
► Mindestfließdruck 1,0 bar
► Maximaler Betriebsdruck 10 bar
► Empfohlener Fließdruck 3 bar
► Volumenstrom bei 3 bar Fließdruck
6 l/min
► Thermostatischer Verbrühungsschutz laut
DIN EN 1111
► maximale Kaltwassertemperatur 15 °C
► minimale Warmwassertemperatur 60 °C
► maximale Betriebstemperatur
- Dauerbetrieb 70 °C
- Kurzzeit (<10 min) 80 °C
- 3 -

Publicité

loading