Télécharger Imprimer la page

GREADEN GR2RT2 Manuel D'utilisation page 7

Publicité

Les langues disponibles

Les langues disponibles

Step 8: Fix the Power Cord on the Iron Base by using 4*15mm screws.
ASSEMBLING PROCESS FOR GR2RT2-E
Step 1: Fix the Bottom Tube to the base by using 3pcs M6*10 bolts.
Step 3: Connect the middle tube with bottom tube by screwing them
together.
Step 4: Connect the top tube with middle tube by screwing them
together. bottom Tube.
Step 6: Place the power cord plug through the top pole, middle pole and
bottom pole, pull the power cord through the bottom of base as far as
it will go.
Step 2: Place the Decoration Cover onto the Bottom
Tube.
Step 5: Place the power cord
plug through the top pole,
middle pole and bottom pole,
pull the power cord through
the bottom of base as far as it
will go.
EN
7

Publicité

loading

Ce manuel est également adapté pour:

Gr2rt2-e