Hauff-Technik GFH 30 Instructions D'installation page 26

Entrée de bâtiment en fibres
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

GFH 30
Align GFH 30 on the outside of the building (see fi g.:
2
6).
Strike GFH 30 into the drill hole on the outside of the
3
buildingusing a hammer (see fi g.: 7).
Press the plastic fl ange of the GFH 30 against the out-
side wall until the butyl tape bulges out at the sides and
provides reliable sealing (see fi g.: 8).
Legend for fi g.: 8
1
Butyl tape on the outside of the building
Unscrew the cap of the resin cartridge (Tangit iM 3000,
4
150 ml) and screw the cartridge onto the mixer jet (see
fi g.: 9).
Then remove the base cover of the resin cartridge (see
fi g.: 10).
Do not throw away the cap and base cover of the
resin cartridge!
26
Art. Nr.: 5090033079
Rev.: 01/2018-09-04
EN
Fig.: 6
Fig.: 7
1
Fig.: 8
Fig.: 9
Fig.: 10

Publicité

Table des Matières
loading

Table des Matières