EN DSM 250S floor grinding machine
5 Acceptance and transportation
3.
Clean and dry the bottom side of the machine
and ETX diamond tools with a cloth or suitable
agents.
4.
Set the machine upright.
5.
Clean the machine dry with a cloth or suitable
agents.
4.5 Checking electrical components
Observe the safety instructions in Chapter 2!
Only suitably knowledgeable, qualified profes
sional electricians may perform work on any
electrical parts of the machine!
Risk of fire due to faulty electrical cables!
—
Check the power line and power plug regularly
for functional safety.
4.6 Final tasks
—
Restart the machine if necessary
(! Chapter 3.1 – page 16).
5 Acceptance and transportation
5.1 Accepting the machine
Observe the safety instructions in Chapter 2!
The machine is delivered in a complete and pack
aged condition from the manufacturer.
1.
Unpack machine and check the enclosed deliv
ery slip to make sure all parts are delivered.
2.
Check whether any items have been damaged
in transit.
3.
In case of damage, contact the transport com
pany immediately!
4.
Report any problems to the manufacturer imme
diately!
Complaints at a later date cannot be acknowl
edged!
5.2 Transporting the machine
Risk of injury from heavy loads!
Suspended loads can fall or tip over, causing
serious injuries!
Do not stand under suspended loads!
Raising and lowering the load must be per
formed by two persons!
Do not raise loads any higher than necessary!
Prevent the load from swinging back and forth!
Keep sufficient safety distance.
Use only transport equipment that has sufficient
capacity for the weight and size of the load!
Observe weight data on packaging or in the ac
companying documentation!
Never walk or reach beneath the load while it is
being lowered.
Wear safety shoes!
Wear protective gloves!
Proceed with the greatest care and caution!
For longer transports or longer storage, the
machine needs to be covered to protect against
soiling.
The machine can be fastened to pallets to protect it
against damages. Relocation over short distances is
possible on the transport wheels.
1.
Pull the power plug out of the power socket.
2.
Fasten all loose parts to the machine.
3.
either:
—
Move the machine to the respective loca
tion with the transport wheels [9, Fig. B/C]
and deposit.
or:
Risk of injury from tilting machine!
The following tasks must be car
ried out by 2 persons! One per
son must hold the machine by
the guide handle [1, Fig. A] at all
times.
a.
Grab the machine by the guide handle
[1, Fig. A] and transport grip [36, Fig. N]
and lift carefully.
b.
Lift the machine onto a suitable transport
device (e.g. a palette) and lower it.
c.
Always secure the machine according to
regulations during transport by a vehicle or
suitable devices and strap down with ten
sion belts.
d.
Move the machine to the new location and
deposit.
19