Télécharger Imprimer la page

JARDINICO ON GROUND BASE Notice De Montage Et D'utilisation page 6

Publicité

Les langues disponibles

Les langues disponibles

· Drill 4 holes on concrete according to the countersunk holes. The holes must
have a depth of at least 10 cm / 4". Make sure that all on ground base holes
align with the drilled holes in the concrete.
Note: the concrete must have a thickness of at least 15 cm / 6"
(20 cm / 8" for balcony and/or rooftop applications).
· Insert the expansion bolts (4x) into the countersunk holes and tighten by using
the allen wrench.
· Align the holes of the tube of your outdoor umbrella with the on ground
base holes. Insert the stem bolts (4x) and tighten by using the allen wrench to
secure. Note: The tube is always included with the umbrella. Wait at least
48 hours before installing the parasol.
· Slide the cover over the tube (optional).
Refer to outdoor umbrella manual for further instructions.
7

Publicité

loading