Toshiba MMW-AP0271LQ-E Manuel D'installation page 57

Masquer les pouces Voir aussi pour MMW-AP0271LQ-E:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 7
• Use the tightening torque levels as listed in the table
below.
Outer dia. of connecting
Tightening torque (N•m)
pipe (mm)
6.4
14 to 18 (1.4 to 1.8 kgf•m)
9.5
33 to 42 (3.3 to 4.2 kgf•m)
12.7
50 to 62 (5.0 to 6.2 kgf•m)
15.9
63 to 77 (6.3 to 7.7 kgf•m)
• Tightening torque of flare pipe connections.
Pressure of R410A is higher than that of R22.
(Approx. 1.6 times) Therefore, using a torque
wrench, tighten the flare pipe connecting sections
which connect the indoor and outdoor units of the
specified tightening torque.
Incorrect connections may cause not only a gas leak,
but also a trouble of the refrigeration cycle.
CAUTION
Tightening with an excessive
torque may crack the nut
depending on installation
conditions.
111-EN
 Airtight test / air purge, etc.
For air tightness test, adding refrigerant, refer to the
Installation Manual attached to the outdoor unit.
CAUTION
• Do not supply power to the
indoor unit and the hot water
module until the airtight test and
vacuuming are completed. (If
the indoor unit or the hot water
module is powered on, the
pulse motor valve is fully closed,
which extends the time for
vacuuming.)
• After the vacuuming is
completed, carry out the
following procedure before
adding refrigerant.
Plate heat exchanger may
explode because the water in
the plate heat exchanger
frozen.
To avoid this phenomenon, add
refrigerant before carrying out a
water supply to the water pipe
system of the Hot Water
Module.
 Open the valve fully
Open the valve of the outdoor unit fully.
 Heat insulation process
Apply heat insulation for the pipes separately at liquid
side and gas side.
• For the heat insulation to the pipes at gas side, use
the material with heat-resisting temperature 120 °C
or higher.
• To use the attached heat insulation pipe, apply the
heat insulation to the pipe connecting section of the
hot water module securely without gap.
REQUIREMENT
• Apply the heat insulation to the pipe connecting
section of the hot water module securely up to the
root without exposure of the pipe. (The pipe exposed
to the outside causes water leak.)
• Wrap heat insulator with its slits facing up (ceiling
side).
Hot water module
Flare nut
Union
Heat insulator of
the pipe
Heat insulation pipe
Banding band
(Accessory)
(locally procured)
 Installation of remote
controller (Sold separately)
For installation of the wired remote controller, follow the
Installation Manual attached with the remote controller.
• Pull out the remote controller cord together with the
refrigerant pipe or drain pipe.
Pass the remote controller cord through upper side
of the refrigerant pipe and drain pipe.
• Do not leave the remote controller at a place
exposed to the direct sunlight and near a stove.
– 56 –
112-EN

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mmw-ap0561lq-e

Table des Matières