Pan & Tilt Adjustments; Installation And Commissioning Instructions; Power Supply Connections - Eneo IPD-52M2712M5A Guide D'installation Rapide

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CAUTION: In the case of installation with Flush/ Surface/ Tilted
mount, IP protection rating is not guaranteed.
If power/video connectors are exposed to water or rain, separate
protection shield is essential.
Pan & Tilt adjustments
1. Pan limit: Adjusts the first pan angle by turning the gimbal 360˚.
2. Tilt limit: Tilt is limited to 25°min ~ 90°max. with reference to the ceiling when the
inclination of camera module is 0°, that is, the image is aligned horizontally.
3. Rotation limit: (Horizontal image alignment): Adjust the rotation angle by turning
the upper gimbal 360°.
CAUTION:
Be careful with the cable twisting during pan or tilt adjustments.
Extreme care should be taken NOT to scratch the bubble dome
surface while the camera installing or adjusting.
Care should be taken the cable is NOT to be damaged, kinked or
exposed in the hazardous area.
Do not expose the camera directly to a strong light source such
as the sun or spot light.

Installation and commissioning Instructions

1. Make sure the power is removed before the installation.
2. After all connections are finished properly, follow the order for applying power.
• Plug the network cable into RJ-45 Ethernet Port.
If PoE is the unique power, there will be no need to connect Power jack.
• When DC12V Local power is necessary, connect the low voltage
(DC12V) first, then plug the DC adapter to DC outlets to avoid an improper reset
from power jitter and a damage from the surge voltage when no load.
When PoE and Local DC power are connected at the same time, Local power has priority.

Power supply connections

Camera can work with either DC12V or PoE(IEEE Std. 802.3af ). Primary and secondary
grounds are completely isolated to avoid the possible ground loop problems.
8

Publicité

Table des Matières
loading

Table des Matières