Télécharger Imprimer la page

Siemens AST10 Mode D'emploi page 10

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14
After connecting the AST10 to the GLB/GDB/ASV181.1E/3
communication connector, all segments are activated for 5 s
in the display.
The AST10 starts searching a GLB/GDB/ASV181.1E/3 via
PPS2 and indicates with a blinking 'Srch' and 'Err' symbol that
no communication is established.
AST10 shows the same behaviour if the connection between
AST10 and GLB/GDB/ASV181.1E/3 is cut.
After having detected a GLB/GDB/ASV181.1E/3 via PPS2 the
AST10 indicates the actual feedback signal value U. The
value is updated every second.
The little triangle
indicates which values are read from
the AST10.
To select one of the values in the upper
row
you simply press one of the
correspondingly marked button.
To select one of the values in the lower
row,
use the cursor button and step through
until you have selected the wanted
value.
10/34
Siemens Building Technologies
74 319 0396 0 c
AST10
B5851
22.11.2011

Publicité

loading