Télécharger Imprimer la page

AeraMax Professional Pro AM II Instructions page 6

Publicité

Les langues disponibles

Les langues disponibles

KEY
1. Control Panel
2. Motion Sensor
3. Front Access Panel
4. Access Panel Latch
5. Certified Filter Sticker
6.
Hybrid filter with
prefilter
7. Cord Management
8. Power Switch
SET UP - Reference KEY section
1. Open unit by pressing the access panel latch (4) down while pulling the front access panel towards you.
2. Remove bag from filter and place back in unit.
MOUNTING MAIN ASSEMBLY
1. Choose an area to mount the unit near a standard outlet receptacle (Cord length about 5'5 [1.6m]).
2. Install the provided mounting bracket to the wall using the 4 screws and 4 anchors provided.
(Recommended: Use level to install bracket)
Note: It is recommended that 2 of the 4 screws are installed into a stud.
• If installed to a stud, no anchor is needed.
• If mounting location is over drywall or other surface requiring additional support, use
anchors provided.
[Anchor use only] Use the bracket provided to mark the desired locations on the wall for
installation. To use anchors, drill a 3/8" (9.5mm) hole in the mounting hole location(s) and press
anchors into the wall. Install screw through the mounting bracket and into the anchor.
3. Hang the unit at an angle on the top hooks of the mounting bracket first as shown in the illustration.
4. Once the top hooks are engaged, press the bottom of the unit flush to the bracket.
5. Remove the filter(s) from the unit and remove their packaging.
6. Place the stickers provided (2) over the top mounting hole locations to maximize performance.
7. Install the filters in the unit.
Note: The "AeraMax Pro Certified Filter Sticker" on the filter must align with the identical sticker found on
the unit. If the filter is not installed properly, the unit will not power on.
8. Plug the power cord into standard outlet receptacle.
9. Reach behind the unit on the back bottom right to access the power switch and turn unit on.
Note: Manual mode will not be available for 1 minute upon initial power-up.
6
4
1
5
2
3
6
Back of Unit
7
8
Step 2
Step 3

Publicité

loading