Operation; Useful Hints - ROBLIN Lumiair Notice D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

GB
-
The wire which is coloured green and yellow must be connected to the terminal in the plug which is
marked with the letter E or by the earth symbol
-
The wire which is coloured blue must be connected to the terminal which is marked with the letter N
or coloured black.
-
The wire which is coloured brown must be connected to the terminal which is marked with the letter
L or coloured red.
ATTENTION: Do not forget to use adequate plugs to the support brackets. Enquire after the
manufacturers. Do an embedding if necessary. The manufacturer accepts no responsibility
in case of a faulty hanging due to the drilling and the setting up of plugs in the ceiling.
1) Unpack the hood parcel putting the translucent diffusers and the tubular fixation by.
2) Mark the centre of the cooking appliance onto the ceiling with a plumb line as illustrated Fig. 6a.
Draw the horizontal axes running parallel to the stove top onto the ceiling
3) Mark the positions on the ceiling for :
Drill the different holes Fig. 6b with the appropriate masonry bit. When fixing the cooker hood to a
plasterboard ceiling ensure it is reinforced as illustrated in Fig. 6c and attach using four Ø10mm nuts
and bolts; ensuring the bolts as sleeved between the plasterboard and the joist supports to prevent
the ceiling being damaged when the bolts are tightened up.
4) Unscrew the 4 socket head cap screws 4 x 10 with an hexagon key 2,5 mm and remove the cover
A from the canopy as illustrated in Fig. 1.
5) Slide up the covers B and A to the top of the tubular fixation C and hold them in position as illustrated
in Fig. 2.
6) Clamp the 2 connectors between the tubular fixation C and the canopy Fig. 3.
7) Fit into each other the tubular fixation C and the round bracket onto the canopy and fit them together
with the 4 pan-head screws 5x 10 (fig. 4).
8) Slide to the bottom the cover A and fit it with the 4 socket head cap screws 4 x 10 (Fig. 5).
9) Connect the mains to the appliance and the lighting connection (Fig. 8).
10) Fit the canopy to the ceiling as illustrated Fig. 7.
Attention: 2 persons are necessary to secure this operation.
11) Slide to the top the cover B and fit it with the 3 pan-head stainless steel screws 3 x 6 onto the tubular
fixation C as illustrated in Fig. 9.
12) Unscrew a little bit the screws item W and then bending the translucent diffusers to place them into
the grooves of the vertical stainless steel pipes, adjust each element and tighten up the screws W.
4

OPERATION

Key
1
:
Key
2
:
Key
3
:
Key
:
5

USEFUL HINTS

To obtain the best performance it is advisable to switch 'ON' the cooker hood a few minutes (in the
boost setting) before you start cooking and you should leave it running for approximately 15 minutes
after finishing.
IMPORTANT: NEVER DO FLAMBÉ COOKING UNDER THIS COOKER HOOD
6
- The cut-out for the mains supply Ø 20 mm.
- The 4 fixing holes for Ø 10 mm nuts and bolts.
low speed
medium speed
high speed
ligthing
or coloured green or green and yellow.

Publicité

Table des Matières
loading

Table des Matières