Télécharger Imprimer la page

LAMS ALLIUM 2,50 M2 Notice De Montage page 11

Publicité

FIXING THE GREENHOUSE BASE TO THE GROUND
FIXING ON SOIL (POINT FOUNDATION)
• Position the greenhouse base in the desired location at a level position.
• Locate the base legs as shown bellow.
• Mark a 300 x 300 mm square around the base legs and dig 450 mm deep.
• Place the greenhouse base, level it and ll the holes with concrete.
1922 mm
2544
FIXING ON CONCRETE SLAB
1922 mm
2544
Niveau 0 - sol fini
Niveau 0 - sol fini
A
11
Earth or concrete lling
1922
It is strongly recommended
to ll the holes with concrete
for a better hold on the ground.
OR
Detail A-A
A
It remains to your free choice and decision to
use the suitable fastening means according to
the supports you chose (wood border, building
stones, cement plates etc.)
300 mm
Rawplug fastening inside
the greenhouse base
Screws and rawplugs
not provided
300 mm

Publicité

loading