Télécharger Imprimer la page

New Installation: Portray / R / Uplift Tech - Robern IQ Uplift Tech 24 Instructions D'installation

Publicité

NEW INSTALLATION: PORTRAY / R
3. Insert lock box shelf into cabinet slightly above the mounting blocks. Gently press the shelf against the back of the cabinet box and
then slide down until the shelf engages with the mounting blocks.
4. Insert the four locking pins [211-1328] provided, two pins per side.
NOTE: Proceed to final section, FINISH THE INSTALLATION (p. 10).
3
4
© 2020 Robern, Inc. 701 N. Wilson Ave. Bristol, PA 19007 U.S.A.
800.877.2376
www.robern.com
/ UPLIFT TECH
3
5
Part no. 209-1313 04/20/2021
IQ Digital Lock Box

Publicité

Chapitres

loading