EINHELL Deluxe I Mode D'emploi page 7

Cabane à outils
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PAGE 47
14: Assembly of the floor profile on the front and rear
walls
14a: Slide the floor profile which was already pre-
assembled in step 11 (side) into the corner cover on
the corner profile.
PAGE 48
15: Assembly of the rain guttering profile on the
front and rear walls
15/a: Slide the rain guttering profile as far as it will go
onto the front or rear wall. It may be necessary to
realign the corner and gable profiles to allow the rain
guttering to be inserted with a perfect fit.
To do this you will need to loosen the bolts on the
assembly panel.
PAGE 49
16: Assembly of the ridge profile on the front and
rear walls
16/a: Slide the ridge as far as it will go onto the front
or rear wall. It may be necessary to realign the gable
profiles to allow the rain guttering to be inserted with
a perfect fit. To do this you will need to loosen the
bolts on the assembly panel.
PAGE 50
17: Assembly of the side struts
17/a: On the side struts, install one bolt approx. 5 cm
from both the top and bottom edge. Please check the
exact quantity required for your equipment shed
model.
17/b: For the 4-panel house, fit four bolts to two side
struts - one bolt approximately 5 cm from the edge at
the top and the bottom of each strut.
In addition, two bolts are installed at the top,
approximately 10 cm from the edge.
PAGE 51
17/c: Only for 4-panel shed (perform assembly step
twice); this step does not apply to the 2-panel and 3-
panel shed; assemble the side struts with the four
pre-assembled bolts (see step 18/b) on the gusset
plates on the floor profile and the rain guttering.
PAGE 53
18: Assembly of the roof struts
Note:
The side struts (roof) are inserted in the next step.
Please make sure that you refer to the reference
diagrams for the 4-panel shed. In this case,
additional bolts are required so that the gusset plates
can be installed in a later step.
4-panel shed - reference diagram for roof
O = Position of the additional pre-assembled bolts
(2 = two bolts)
= Position of the already assembled gusset plates
on the ridge and the rain guttering
PAGE 54
18/a: On the side struts, install one bolt approx. 5 cm
from both the top and bottom edge.
It is imperative that you follow the assembly
instructions for your equipment shed.
18/b: Only for 4-panel shed (perform assembly step
twice); this step does not apply to the 2-panel and 3-
panel shed; install three bolts on each end of the
profiles of two side struts. The two bolts lying further
inward must be fitted approx. 15 cm from the edge
and the outer screw approx. 5 cm from the edge.
PAGE 55
18/c + 18/d: Only for 4-panel shed (perform
assembly step twice); this step does not apply to the
2-panel and 3-panel shed;
18c: First attach the side struts already assembled in
step 18/b to the gusset plates (side). Insert the struts
from the outside between the ridge and the rain
guttering.
PAGE 57
19: Assembly of the gusset plates
19/a: Only for 4-panel shed (perform assembly step
twice); this step does not apply to the 2-panel and 3-
panel shed; attach the gusset plates at an angle of
120° to the struts on which the bolts have been pre-
assembled.
19/b: Only for 4-panel shed (perform assembly step
twice); this step does not apply to the 2-panel and 3-
panel shed; to finish with, attach a gusset plate at an
angle of 120° to the roof struts on which the bolts
have been pre-assembled.
GB
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Deluxe iiDeluxe iii37.131.4037.131.0037.131.20

Table des Matières