Sennheiser ew 100 G2 Notice D'emploi page 63

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

16
To mount two EM 100 G2 into a rack:
Place the two receivers side by side onto a flat sur-
face, their bottom sides facing upwards.
Align the connecting plate
bottom sides of the receivers.
Secure the connecting plate
using eight of the supplied recessed head screws
(M 3x6).
Hook the two rack mount "ears"
panels of the receivers.
Secure the rack mount "ears" to the receivers using
two of the supplied recessed head screws (M 3x6)
respectively.
Slide the receivers into a 19" rack.
Screw the rack mount "ears" tight.
When mounting only one receiver into a rack, use the
connecting bar
instead of the second receiver.
Hook the two rack mount "ears"
panel of the receiver.
Secure the rack mount "ears" to the receiver using
two of the supplied recessed head screws (M 3x6)
respectively.
Secure the connecting bar
mount "ears"
using two of the supplied recessed
head screws (M 6x10).
If you are not front mounting the antennas, insert
the two covering plugs
the connecting bar.
Slide the receiver into a 19" rack.
Screw the rack mount "ears" tight.
To mount the receiver's antenna connection to the
front of the GA 2 rack adapter using the AM 2 antenna
mount:
Screw the two BNC sockets
cables to the connecting bar
plain washers and nuts.
Connect the two BNC connectors
sockets
and
at the rear of the receiver.
Slide the receiver into a 19" rack.
Screw the rack mount "ears" tight.
Connect the two telescopic antennas
BNC sockets
.
Pull the telescopic antennas out and align them
upwards in a V-shape.
over the holes in the
to the receivers
to the front
to the front
to one of the rack
into the antenna holes of
of the BNC extension
using the supplied
to the BNC
to the two

Publicité

Table des Matières
loading

Table des Matières