Télécharger Imprimer la page

AVIRE Boitier de navigation 02 Manuel D'installation page 2

Avec batterie. can, batterie de secours intégrée, indicateur de position pour afficheurs e-motive, compatible avec lms lite

Publicité

Les langues disponibles

Les langues disponibles

Technical Specification
4-Wire CANBus system
Power
Consumption
Connections
Operating temperature
Dimensions (L x W x H)
Installation
Basic (default) installation summary:
[Navigation Box, 4-wire CANbus, DCP]
(1) CAN
(2) CAN
(3) LED
Step 1
Setup and configure DCP in the
machine room ensuring there
is a twisted pair available from
DCP to elevator car
Step 4
Place the Navigation box on the
floor in order to begin the Nav
Learn process.
Step 5
(4) Dip Switch
Once complete (green LED
showing), turn dip switch 3 off
Device receives power from DCP or CANBus
splitter (with power supply). No external power
supply required.
Supply voltage 10 - 30VDC (240VAC from DCP)
0.5W
CANbus
0ºC to +60ºC
138 x 64 x 31 mm
Step 2
In the car, ensure you are at the
bottom floor of the installation.
Turn on dip switch 3.
Step 3
For Nav Learn press every
button going up to the top floor.
Once at top press every button
going down to the bottom floor.
Step 6
Mount Navigation box to top of
elevator car and connect 4-wire
CANbus
2

Publicité

loading

Ce manuel est également adapté pour:

Ac-nav02-m0-900