Installation Under Traffic Areas Up To Hgv60 - Faserplast ECO BLOC INSPECT 420 Notice D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

9.

Installation under traffic areas up to HGV60

Cover + bearing
layer acc. RStO 12
Frost
protection
layer
+
earth
covering acc. RStO
12 and installation
manual
EcoBloc
Inspect
system
Blinding
Traffic surfaces up to HGV60 should be structured according to prevalent guidelines (e.g. RStO 12 of the
Forschungsgesellschaft für Strassen- und Verkehrswesen research body). The blinding is preferably
made from gravel with a grit of 8mm/16mm and is 8-10 cm thick.
The EcoBloc Inspect system must be installed and connected in accordance with chapter 7. Ventilation
heads should be installed in green spaces.
9. Installation under traffic areas up to HGV60
HGV60
HGV60
30 / 64
H
acc. RStO 12
AS
▼E
=45MN/m²
v2
min. 800 mm
H
R
▼E
=25MN/m²
v2
8-10cm

Publicité

Table des Matières
loading

Table des Matières