Fisher & Paykel DCS ADR2-48 Guide D'utilisation page 10

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
MAKE CUTOUT AND INSTALL SUPPORT STRUCTURE - FLUSH INSTALLATION
1. Make a cut-out in your cabinet or island with the following dimensions:
NOTE: Each corner of the cutout should be 90º for the Access Drawers to fit properly.
Vent*
90º
90º
B
* Island installation to use minimum of 3 vents
providing 10 sq. in. per vent (typical).
A
A
Model
(-0,+1/8")
C
ADR2-48
48 3/16"
ADR2-36
36 3/16"
ADR2-30
30 3/16"
ADR2-24
24 3 /16"
2. Place 3" X 4"s to provide support for the Access Drawers structure
in the locations indicated in the figure opposite (Fig. 4B).
3. Board lengths are provided in the table opposite (Fig. 5B).
Note: The frame should locate the Access Drawer assembly in the
center of the cutout, and be fastened to the enclosure such that the
unit is reliably secured in place.
B
Vent*
A
C
B
A
C
CUTOUT DIMENSIONS
B
C
(-0,+1/8")
22-1/16"
1.0" min.
22-1/16"
1.0" min.
22-1/16"
1.0" min.
22-1/16"
1.0" min.
Vent*
D
Fig. 3B
D
A frame should be constructed 2" (51 mm)
1.0" min.
setback from the front face of the product
to both push the product up against and
1.0" min.
conceal the cutout clearance around the front
1.0" min.
frame.
Important!
1.0" min.
Do not seal the product in with silicone caulk or
similiar. Doing so will result in the product being
difficult to remove for servicing.
8
2 - 5/8" (67 mm)
D
Minimum 3/16" (4 mm) cutout
clearance around front frame

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Dcs adr2-30Dcs adr2-36Dcs adr2-24

Table des Matières