Franke FNES 907 BTH XS/GLASS Mode D'emploi Et Installation page 10

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

• Before hooking the hood body it is necessary to tighten 2 Vr screws
placed in the fixing points of the body.
• Hook the hood body on the 12a screws.
• Tighten completely 12a support screws.
• The correct hood body position can be levelled with Vr screws.
• Fix the hood definitively by tightening the 12a security screw.
DUCTED VERSION AIR EXHAUST SYSTEM
When installing the ducted version, connect the hood to the
chimney using either a flexible or rigid pipe ø 150 or 120 mm,
the choice of which is left to the installer.
• To install a ø 120 mm air exhaust connection, insert the re-
ducer flange 9 on the hood body outlet.
• Fix the pipe in position using sufficient pipe clamps (not sup-
plied).
• Remove any activated charcoal filters.
RECIRCULATION VERSION AIR OUTLET
• Insert the connection extension pieces laterally 14.1 in connec-
tion 15.
• Insert the Connector 15 into the Support bracket 7.3 and fix it
with a screw.
• Make sure that the outlet of the extension pieces 14.1 is hori-
zontally and vertically aligned with the chimney outlets.
• Connect the air outlet connection 15 to the hood body outlet
using either a flexible or rigid pipe ø 150 mm, the choice of
which is left to the installer.
• Ensure that the activated charcoal filters have been inserted.
EN
Hood body installation
Connections
Vr
12a
ø 150
9
14.1
7.3
15
ø 150
ø 120
1
10
0

Publicité

Table des Matières
loading

Table des Matières