Important; Before You Begin - The Galley Ideal Workstation Guide D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

IMPORTANT

1. Please note: Unlike typical undermount kitchen sink installations, The Galley is installed in the cabinet prior to the counter being
templated. A support structure, (wood frame cleat system), will need to be constructed and mounted inside the base cabinet(s)
and recessed 1/16" from the top of the cabinet(s).
2. The Workstation and Tap require a minimum of 22 1/2" inside the cabinet. For 24" deep inset cabinets installed against a wall
the cabinet must be pulled 1" away from the wall.
3. For countertops with a laminated or built-up decorative front edge, construct the wood support frame to finish 1/16" below the
underside of the counter top cutout area.
4. Leave the installation instructions tray and black braces affixed to the Workstation flanges until after countertop has been
installed.
Inspect The Galley for any damage prior to installation. For any questions or concerns please contact us immediately
at 800.375.4255 or customerservice@thegalley.com.
Please refer to all local plumbing and building codes prior to installation.
Tools
CLAMPS (OPTIONAL)

Before You Begin

If your cabinet(s) have been built to accomodate your Galley, proceed to step one.
If you are joining two or more cabinets together to house the Galley,
you will need to trim the bulkheads to create an 11" clearance for the basin.
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Workstations avec drydockBarstationWashstations

Table des Matières