Preparing The Opening - GE JGP336 Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions
A

PREPARING THE OPENING

The following MINIMUM clearance
A1
dimensions must be maintained.
13" MAX. Depth
of unprotected
overhead cabinets
30" MIN.
clearance from
countertop to
unprotected
overhead surface
3 3/4" MIN.
clearance from
cutout to side
wall on the left
of the unit
A2
Overall cooktop dimensions
30"
COOKTOP
19 3/8"
Cutout dimensions of the
A3
To insure accuracy, it is best to make
a template when cutting the opening
in the counter.
2 1/4" Min.
Between cutout
and the wall behind
the cooktop
2 1/2"Min.
2 1/2" Min.
from front edge
of cutout
and front edge
of countertop
3 3/4" MIN.
3 3/4 MIN.
clearance from
cutout to side
wall on the right
of the unit
18" MIN.
height from
countertop to
nearest cabinet on
either side of unit
21"
3"
28 1/4"
countertop
19 5/8" width of cut
14 1/4"
28 1/2"
length of
cut
The recommended Gas Supply
A4
Location from the backwall.
Recommended
gas supply
location.
Make sure the wall coverings,
A5
countertop and cabinets around the
cooktop can withstand heat (up to
200°F) generated by cooktop.
Wall covering,
cabinets and
countertop
must withstand
heat up to 200°F.
4
1"Min. From Backwall
1" Min. from Backwall
13 1/4"
From Cutout
Center Line

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Jgp930Jgp326

Table des Matières