Télécharger Imprimer la page

GEV 215042 Installation page 2

Publicité

Les langues disponibles

Les langues disponibles

INSTALLAZIONE SCHEDA DI CONTROLLO 
INSTALLATION CONTROL BOARD
INSTALLATION STEUERKARTE   
INSTALLATION CARTE
Before performing setup operations, empty the tank and the boiler completely to allow correct calibration of the pressure
switches; note that the boiler pressure switch is only present on versions with rinse pump (CRP).
After replacing or updating the board via USB, the Installation Menu will be displayed.
Menu access and navigation may vary according to the type of display.
Using button 2 (SPECIAL PROGRAMME SELECTION) you can scroll through the options and activate and/or edit
them using buttons 3 and 4 (PROGRAMME SELECTION and START).  
To exit the menu, hold pressed button 1 for 5 seconds.  
To access the Installation Menu, again, with the machine in stand-by and the door open, simultaneously press buttons
1 and 2 for 5 seconds and enter the code CH 35 (buttons 3 and 4 to change the parameter, 1 to confirm).
 
Using button 1 (ON/OFF) you can scroll through the options and activate and/or edit them using buttons 2 and 3
(CYCLE SELECTION and START). The list of possible options that can be displayed is as follows:
To exit the menu, hold pressed button 1 for 5 seconds. 
To access the Installation Menu, again, with the machine in stand-by and the door open, simultaneously press buttons
2 and 3 for 5 seconds and enter the code CH 35 (buttons 2 and 3 to change the parameter, 1 to confirm).
The list of possible options that can be displayed is as follows:
 
LED
LCD
Interface  
Display  
Sw Code  
 
Tank Press.
 
Calibration
Tank Level
 
Probe Voltage  
Boiler Press.
Calibration  
 
Tank Level
 
Probe Voltage
Steam
 
Condenser.
Drain Pump  
 
Preheating  
 
Water Softener   Enable incorporated automatic water softener (*optional)  
 
The list varies according to the type of machine.
For machines with LCD display, it may be necessary to update the control panel firmware. 
 
 
"Installation Menu"
 
 
 
Enter the "software code" given on the electrical components panel on the
machine  
Calibration of analogue pressure switch: press button 3/4 (START)
Shows the calibration value of the analogue pressure switch
Shows in mm the value measured by the analogue pressure switch
Shows the voltage of the analogue pressure switch. 
Calibration of analogue pressure switch: press button 3/4 (START)
Shows the calibration value of the analogue pressure switch
Shows in mm the value measured by the analogue pressure switch
Shows the voltage of the analogue pressure switch. 
Enable steam condenser (*optional)  
Enable drain pump (*optional)  
Activationof the rapid heating function.  
 
 
Board 215042
215042‐1 
 
 
 
 
442481  
 

Publicité

loading