Installation Precautions; System Overview - Watts Oneflow OF1465 Manuel D'installation, De Fonctionnement Et D'entretien

Systèmes antitartre. prévention contre le tartre sans produits chimiques ni sel
Masquer les pouces Voir aussi pour Oneflow OF1465:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Important notice about iron, manganese and copper in the
water supply
Iron and Manganese
Just as with conventional water softening media, OneFlow
to be protected from excess levels of certain metals that can easily
coat the active surface, reducing its effectiveness over time. Public
water supplies rarely, if ever, present a problem, but if the water
supply is from a private well, confirm that the levels of iron (Fe) and
manganese (Mn) are less than 0.3 mg/L and 0.05 mg/L respec-
tively.
Copper
Copper usually originates from new copper plumbing upstream
of the OneFlow
system. If this condition exists, we recommend
®
waiting a minimum of 4 weeks before placing the system in
operation. This will allow the copper surfaces to be fully flushed
and develop a natural protective surface. To further minimize
any problem with excess copper, avoid applying excess flux on
the inner surfaces of the pipe and to use a low-corrosivity water
soluble flux listed under the ASTM B813 standard. Whenever
new copper is installed upstream of a OneFlow system, it must
be bypassed for at least four weeks.
The EPA drinking water standards allow for up to 1.3 ppm of
copper. Therefore, it is very important to test the feed water for
copper. Oneflow should not be installed if any copper is present
in the feed water.
• Do not let the system freeze. Damage to the tank may
result.
• S ystem must be operated in a vertical position. Do not lay
it down during operation. The system may be placed in any
position for shipping and installation but must be operated
in the vertical position.
• P lace the system on a smooth, level surface. Because the
system operates in an upflow, fluidized bed mode, having a
level surface is more important than with a softener or media
filter.
• A bypass valve should be installed on every system to facili-
tate installation and service.
• O bserve all local plumbing and building codes when install-
ing the system.
The OneFlow
system differs from a conventional softener or
®
media filter in a number of key respects.
• T he system is light and only partially filled with media. This is
normal. The upflow operation of the system requires a lot of
freeboard to allow the bed to fully fluidize.
• T he system has no underbed so you can tip the system
over without any fear of upsetting the media. This makes
transportation and installation much easier than conventional
systems.
• B ecause the OneFlow
®
the tank connections are opposite of what you're used to.
• P lease see the Important note about iron, manganese and
copper above.
• P lease see the note about "Using OneFlow
water treatment equipment" on the next page.
system operates in the Upflow mode,
with other
®

Installation Precautions

• D o NOT install system on line pressure above 100psi.
• D o NOT install the system backwards with the feed water
line connected to the outlet.
needs
®
• D o NOT install system in direct sunlight or where system is
exposed to harsh chemicals or may be subjected to being
struck by moving equipment, carts, mops or any other item
that may cause damage.
• D o NOT install the unit behind equipment where it may be
difficult to access the system for filter replacement.
• Do NOT install the OneFlow® system near any source of
heat. Also, do not install the system near any device or
break out area that would be adversely effected by water.
• IF water hammer is evident, install water hammer arrestors
before the OneFlow
• A lways back-up valves and fittings with a wrench when
installing a fitting to avoid turning the valve.
Position the OneFlow

System Overview

Using OneFlow
equipment.
Due to the unique properties of OneFlow
unique requirements for using OneFlow
filtration or other forms of water treatment.
1. O neFlow
must be the last stage in the treatment chain. Do
®
not install any filters after OneFlow
for which scale prevention is required. POU filters, e.g. car-
bon or RO are exempt from this requirement.
2. D o not apply phosphate or any other antiscalant either
before or after OneFlow
2
unit.
®
unit in a suitable location.
®
Outlet - 2" PVC socket
Outlet Screen
Media Tank
Inlet Screen/Difffuser
2" Union (socket)
2" Elbow (street)
Inlet - 2" PVC socket
with other water treatment
®
®
in conjunction with
®
or before any devices
®
.
®
, there are some

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Oneflow of1665

Table des Matières