Mounting
Unless otherwise specified, all information on mounting relates to the instal-
lation type "flow right". Conversion is described in chapter "Interchanging
flow/return" on page 15.
1. Remove the upper shell of the heat insulation (see "Heat insulation" on
page 8).
The upper shell of the heat insulation is only reinstalled after completion of
all mounting work.
5.1
Preparing mounting
Only mount the product after having completed all pipe assembly work, all
welding work and all soldering work.
If you install the product in an existing system, observe the information in
chapter "Retrofitting the product" on page 25.
 Verify that the nominal pressure of the product corresponds to the speci-
fication value of the system.
 Verify that the liquid in the system and the application area of the product
are compatible.
1. Flush the lines of the system before installing the product.
14
PrimoTherm®
Mounting