Start-Up And Operation - Franklin Electric Fhoton Drive Guide D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Control
Switch-Stop
Control
Switch-Run
Two Control Switch Operation
NOTE: All control switch configurations are superseded by the "FLOW SWITCH". If the flow switch detects low flow it will "OPEN" and
override the run signals sent by the control switches to protect the motor and drive.

Start-Up and Operation

After all appropriate connections have been made, place the cover on the Fhoton™ Drive, then apply power to the controller. A steady
green light in the center of the cover indicates that the Fhoton™ Drive has DC power connected. No light can indicate that the polarity is
reversed, assuming sufficient DC voltage is available. Additionally, use a DC voltmeter to confirm proper polarity and sufficient DC voltage.
NOTE: For optimal operation results, it is recommended to flush the bore well system until the water being discharged is clear and
free of debris. The flow switch should not be installed in-system during the flush. This will reduce the chances of the flow switch
being clogged by sediment and debris during initial start-up. (See Flow Switch section for details on bypassing flow switch to clear
debris on initial start-up).
(OPEN)
(CLOSED)
Pumping
Range
(OPEN)
(CLOSED)
Figure 8: Control Switch Operations
(OPEN)
Control
Switch-Run
(CLOSED)
One Control Switch Operation
Pumping
Range
19

Publicité

Table des Matières
loading

Table des Matières