Combustion Air Supply - EHV Kanuk 1 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Kiln shell of the Kanuk® Classic
Step I
Push the hangers at the top and
bottom into the fi rst and last ra-
diation tube. The side panels will be
clipped into the bottom hangers.
Step II
Fix the side panels with the accom-
panying screws at the top hangers.
Self-closing door layout I
Remove the circlip of the door-fi xing bolt. Now pull
the bolt to the top and push it into the torsion spring.
The medium hanger of the spring will be fi xed on
the doorframe. The ends of the springs are to be
fi xed behind the door suspension. Now return the
bolt to the primary position and fi x it with the circlip.
Please make sure to fi x the door additionally during the
entire process.

1.2 Combustion air supply

The combustion air supply is suffi cient for Kanuk® hot-air kilns up
to a nominal heating capacity of 27 kW, provided there is at least
one door or window to be opened. Furthermore, the room needs a
cross-section of at least 150 cm². The room must not fall below 4 m³
per kW of nominal heating capacity.
EHV GmbH • Entwicklung | Herstellung | Vertrieb • Hauptstraße 131 • 01744 Dippoldiswalde
CONSTRUCTION MANUAL
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Kanuk 2Kanuk 3Kanuk 4

Table des Matières