Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

No
te: Charging conditions differ by time zone locations and affects total hours of light discharge.
Note: Batteries may have become depleted due to lack of sunlight for an extended
period causing the bulbs to not illuminate. Please place the solar head in direct
sunlight for at least 6 hours prior to assembly.

PREPARATION

Before beginning to assemble or installing lighting fixture, make sure all parts are present. Compare
parts with package contents list and hardware contents list. If any part is missing or damaged, do
not attempt to assemble, install or operate the product.
Estimated Assembly Time: 30-60 minutes.
Tools Required for Assembly: Flathead Screwdriver, Phillips Screwdriver, Adjustable Wrench/Pliers
1/2 in Wrench, ladder and hammer.
DETERMINE DESIRED INSTALLATION-PERMANENT CONCRETE PAD OR GROUND STAKE
INSTALLATION: PERMANENT CONCRETE PAD
25.4 cm / 10 in
5 cm / 2 in
12.7 cm / 4 in
Thread three Anchor Bolts (J) into the Concrete Mounting Bracket (I) allowing for 5 cm (2 in) above
the Mounting Bracket. Excavate a hole in the ground that measures at minimum 25.4 cm (10 in) in
diameter and has a minimum depth of 12.7 cm (4 in).
Fill the hole with concrete and insert the Concrete Mounting Bracket (I) and Anchor Bolts (J) before
the concrete dries. Allow concrete to dry before installing Pole Assembly.
Note: The concrete and the Concrete Mounting Bracket (I) should be at GROUND LEVEL,
with the Anchor Bolts (J) 2 inches above the ground.
4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

1900527

Table des Matières