Installation; Moving The Unit; Assembling The Unit; Electrical Hookup - Fasep B140.G2.T Manuel De L'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fasep 2000 srl
Balatron B140.G2.TC: User's Manual
2

INSTALLATION

2.1

Moving the unit

I
WARNING
2.2

Assembling the unit

For ease of transportation, the wheel balancer might be disassembled
into units. If necessary, assembling instruction are provided within each
package.
2.3
Installation
The wheel balancer must be installed on a firm and level ground.
G
NOTE:
the machine must be levelled and locked, using the levelling
handles in the base.
2.4

Electrical Hookup

!
CAUTION:
2.4.1
Electrical hookup is to be provided by a qualified electrician.
2.4.2
A fusible wall-mounted switchbox is required at the installation site. This switch should provide on-off control and overload
protection for your wheel balancer only. The switchbox should be fused with time-delay fuse(s) in accordance with the power
rating specified on your wheel balancer.
2.4.3
Electrical connection of the machine should be by plug connectors.
2.4.4
The balancer must be effectively connected to ground. The electric cord is regularly provided with a ground terminal.
2.4.5
Make sure that Power Rate Specifications for your wheel balancer (refer to nameplate on the wheel balancer) comply with
those provided by the external power source.
!
CAUTION
The unit is operated with 12V battery,
Wall mount battery charger is provided.
When the unit has to be moved: never lift balancer
by motor shaft.
Failure to follow these instructions can results in
damage to unit or create an electrical hazard and
will void warranty.
After electrical hookup has been performed unit is ready to operate. Always observe pertinent safety
precautions when operating the unit (see Appendix tables for an overview of relevant Safety
requirement).
2-2
Rev. 1.3
01 June 2013

Publicité

Table des Matières
loading

Table des Matières