described in the following. Mounting of the right valve is carried out analogously.
Kompaktboy Double
1.
Lay the supplied seal ring (O-Ring DN 100) into
the groove of the pressure outlet of the collecting
tank.
2.
Insert the threaded bolt (M16x60) into hole 1
3.
range the holes/threaded hole congruently.
4.
Screw the nut (M16) on the threaded bolt 1.
5.
Screw in the 3 screws M16x40 and
tighten the 4 screw connections equally cross-
wise.
6.
Put the flange seal DN 100 on the connection
flange of the shut-off valve.
7.
Put on the Y-pipe. While doing so, arrange the
holes/threaded holes congruently.
8.
Create screw connections with 4 screws
M16x100 and
4 nuts M 16 between the shut-off valve and
adapter flange and equally tighten crosswise.
en English
-
75