Operation - GreenWorks BAM704 Guide D'utilisation

Batterie multi-tension 24v - 48v
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

OPERATION

CHECKING BATTERY CAPACITY
Note: The battery is not shipped fully charged. It is recommended to fully charge before the first
use to ensure that maximum run time can be achieved. This lithium-ion battery will not develop a
memory and can be charged at any time.
Press the battery capacity indicator (BCI) button. The lights will illuminate according to the battey
capacity level. See chart below:
BATTERY CAPACITY
INDICATOR (BCI) BUTTON
BLUETOOTH LIGHT
METER
Lights
3 Green Lights
2 Green Lights
1 Solid Green Light
1 Blinking Green Light The battery is at 10-20% capacity
No Green Lights
BATTERY CAPACITY
INDICATOR (BCI) BUTTON
Lights
3 Green Lights
2 Green Lights
1 Solid Green Light
1 Blinking Green Light The battery is at 10-20% capacity
No Green Lights
Capacity
The battery is at 80-100% capacity
The battery is at 50-80% capacity
The battery is at 20-50% capacity
The battery is under 10% capacity and requires
charging immediately
LIGHT LED METER
Capacity
The battery is at 80-100% capacity
The battery is at 50-80% capacity
The battery is at 20-50% capacity
The battery is under 10% capacity and requires
charging immediately
7
LIGHT LED METER
BATTERY METER
BLUETOOTH LIGHT
METER

Publicité

Table des Matières

Dépannage

loading

Ce manuel est également adapté pour:

Bam706

Table des Matières