Operating Tips - ACV HelioPlan S Mode D'emploi

Masquer les pouces Voir aussi pour HelioPlan S:
Table des Matières

Publicité

SS-0
Flushing and filling
For safety reasons, charging is to be carried out only when there is no direct sunlight or when the collectors are covered. Especially
in areas liable to freezing, an anti-freeze/water mixture of up to 40% must be used. To protect materials from excessive thermal load,
the system should be charged and commissioned as soon as possible, after 4 weeks at the latest. If this is not possible, the flange
seals should be renewed before commissioning to prevent leaks.
Attention:
Antifreeze that is not pre-mixed must be mixed with water prior to filling!
Recommended antifreeze for flat plate collectors: TYFOCOR-L
40% proportion of antifreeze (60%/water) - freezing point: -22° C/solidification point: -26° C
50% proportion of antifreeze (50%/water) - freezing point: -32° C/solidification point: -44° C
It may not be possible to completely empty collectors once they have been filled. For this reason, collectors exposed to frost should
only be filled with a water/antifreeze mixture, also for pressure and function tests. Alternatively, the pressure test can also be carried
out using compressed air and leak detection spray.
Installing the temperature sensor
The temperature sensor should be installed in the sensor sleeve nearest to the collector array flow. To ensure optimal contact bet-
ween the sensor and the surrounding environment, the gap between the sensor sleeve and the sensor element should be filled with
a suitable conducting compound. All materials used for installing temperature sensors (sensor element, conducting compound,
cables, sealing and insulating materials) must be suitably temperature resistant (up to 250° C).
Operating pressure
The maximum operating pressure is 10 bar.
Bleeding
The system must be bled:
- when commissioning the system (after filling the collectors)
- 4 weeks after commissioning
- when necessary, e.g. if there are malfunctions
Warning:
Risk of scalding due to steam and hot heat transfer fluid!
Only operate the bleeding valve if the temperature of the heat transfer fluid is < 60° C. When bleeding the system, the collectors must
not be hot! Cover the collectors and, if possible, bleed the system in the morning.
Check heat transfer fluid
The heat transfer fluid must be checked every two years with regard to its antifreeze and pH value.
- Check antifreeze using antifreeze tester and replace or refill if necessary!
Target value is ca. - 25° C and - 30° C depending on climatic conditions.
- Check pH value with a pH indicator rod (target value approx. pH 7.5):
If the limit pH value is less than ≤ pH 7, replace the heat transfer fluid.
Maintenance of the collector
The collector or the collector array must be inspected visually, once a year, for any damage, leaks and contamination. Additional
recommendations on operation and maintenance can be found in the supplier's general documentation and instructions on commis-
sioning and maintenance.
10
Recomendaciones para el funcionamiento
EN
Betriebsempfehlungen

Operating tips

Consigli per la messa in funzione
Recommandations d'emploi

Publicité

Table des Matières
loading

Table des Matières