FIGURE 19 - HORIZONTAL RIGHT VENT AND DRAINING OPTION
TOP VENT INSTALLATION
RIGHT VENT INSTALLATION
FIGURE 20 - DOWNFLOW VENT AND DRAINING OPTION
IMPORTANT:
• PRIME CONDENSATE TRAP WITH WATER AND
CUT DRAIN HOSES TO PROPER LENGTH.
• CUT PRESSURE SWITCH TUBING TO PROPER
LENGTH.
• DO NOT SUBMERGE TERMINATION OF DRAIN
HOSE.
IMPORTANT:
• PRIME CONDENSATE TRAP WITH WATER AND
CUT DRAIN HOSES TO PROPER LENGTH.
• CUT PRESSURE SWITCH TUBING TO PROPER
LENGTH.
• DO NOT SUBMERGE TERMINATION OF DRAIN
HOSE.
RIGHT VENT INSTALLATION
33
IOM
W415-2308 / B / 11.04.19