Heath Zenith SL-6133 Mode D'emploi page 2

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Remove the existing switch plate and switch and disconnect its two wires.
Save the switch plate and screws to reinstall later.
If there are more than two wires attached to the switch, consult with an electrician
about installation. In addition, some local building codes may require installation
by a qualified electrician.
4. Connect a wire coming from the receiver to one wire you removed from
the switch. Use one of the supplied wire connectors to secure the wires
(see Figure 1).
5. Similarly connect the other wire coming from the receiver to the other wire you
removed from the switch. Secure the wires with a wire connector
Receiver
6. Check your wire connections to make sure they are secure and that no bare
wires are exposed.
7. Position the receiver with the master switch to the right. Use the two screws
you removed earlier and mount the receiver to the wall box. Push the
excess wiring into the wall box while you do this. You may have to bend
the wires to fit inside the box. You will mount the switch plate later.
8. Turn on the power to the light switch circuit. Do this at your circuit breaker or
fuse box.
Figure 1 - Receiver Installation
-2-
Junction Box
595-4918-05

Publicité

Table des Matières
loading

Table des Matières