Chapin 97300E Manuel D'utilisation Et D'entretien page 6

Masquer les pouces Voir aussi pour 97300E:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Chapin Spot Sprayer Operator's Manual - English
WAND ASSEMBLY
Make sure the o-ring is installed on the end of the wand. Insert the wand into shut-off valve.
Turn and tighten the retaining nut clock-wise onto the shut-off valve.
Wand
Retaining Nut
O-ring
Shut-Off Valve
ATTACH CHEMICAL CONCENTRATE TANK
Before chemical tank installation, attach supplied rachet straps to strap slots on tank.
Securely fasten assembly to ATV. NOTE: not all models included ratchet straps.
Attach the mix valve's suction tubing (1) to the chemical concentrate tank's quick release
port (2). Secure chemical concentrate tank with nylon webbing (3).
2
1
3
INSTALL DRAIN CAP
Assembled
Install cap lanyard around drain plug. Screw drain cap (H-5) on drain plug.
H-5
5E

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

97500e

Table des Matières