Télécharger Imprimer la page

Yamaha YZ426F 1999 Manuel D'atelier page 518

Publicité

SWINGARM
EC575000
ASSEMBLY AND INSTALLATION
EC575201
Bearing and oil seal
1. Install:
Bearing 1
Oil seal 2
To swingarm.
NOTE:
Apply the molybdenum disulfide grease on
the bearing when installing.
Install the bearing by pressing it on the side
having the manufacture's marks or numbers.
First install the outer and then the inner bear-
ings to a specified depth from inside.
Installed depth of bearings:
Outer a: Zero mm (Zero in)
Inner b: 8.5 mm (0.33 in)
2. Install:
Bearing 1
Oil seal 2
To relay arm.
NOTE:
Apply the molybdenum disulfide grease on
the bearing when installing.
Install the bearing by pressing it on the side
having the manufacture's marks or numbers.
Installed depth of bearings a:
5 mm (0.20 in)
3. Install:
Bearing 1
Oil seal 2
To connecting rod.
NOTE:
Apply the molybdenum disulfide grease on
the bearing when installing.
Install the bearing by pressing it on the side
having the manufacture's marks or numbers.
Installed depth of bearings a:
5 mm (0.20 in)
5 - 53
CHAS

Publicité

Chapitres

loading

Ce manuel est également adapté pour:

Yz426fm 1999Yz426lc 1999