Frigidaire Professional Série Manuel D'utilisation page 8

Masquer les pouces Voir aussi pour Professional Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

WIRING
Note: Electrical wiring must be done by a qualified person(s) in accordance with all applicable codes and standards.
This range hood must be properly grounded. Turn off electrical power at service entrance before wiring.
1. Remove the (2) screws of the upper flue and move the upper flue towards the bottom.
2. Feed 6" of power cable through the top opening of the support frame bracket (installed on ceiling) and into the wiring
box. For the Non-Ducted Hoods, do not use the upper hole of the wiring box.
Secure cable to the wiring box using an appropriate connector.
3. Feed the range hoods power cable through the lower hole of the wiring box (use a wire clamp located in the Hardware
Package.
4. Make electrical connections. Wire white-to-white, black-to-black and green-to-green.
5. Push all wiring inside the wiring box. Install the wiring box cover with (2) 3.9x9.5mm screws and (2) serrated washers
making sure wires are not pinched.
6. Tuck excess power cable inside the flue.
7. Reinstall the upper flue.
BLK-BLK
WHT-WHT
GRN-GRN
WIRING BOX
COVER
- 8 -
LINE IN 120 VOLTS - 60 HZ
WIRE CLAMP
FIG. 20

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Professional pl36pc40ec

Table des Matières