Mitsubishi Electric CITY MULTI PEFY-P40VMH-E2 Manuel D'installation page 5

Masquer les pouces Voir aussi pour CITY MULTI PEFY-P40VMH-E2:
Table des Matières

Publicité

[Fig. 9.2.1]
B
A
M1M2
M1M2
S
TB3
TB5
[Fig. 9.2.3]
B
D
1
S
M2
M1
N
L
[Fig. 9.3.1]
C
B
A
[Fig. 9.3.3]
M1
M2
S
B
C
A
1
2
M1M2
S
1
2
TB15 TB5
TB15
C
C
2
A
DC10~13V
C
A
B
1
2
Screws
A
Terminal box cover
B
Control box cover
C
A
Terminal block
A
Round terminal
B
Shield wire
C
D
The earth wire from two cables are connected together to the S terminal. (Dead-end connection)
D
Insulation tape (To keep the earth wire of the shielded cable from coming in contact with the trans-
E
E
mission terminal)
9.2
[Fig. 9.2.2]
B
M1M2
TB3
TB5
[Fig. 9.2.4]
D
M1
N
L
9.3
[Fig. 9.3.2]
B
C
A
B
C
D
E
A
A
M1M2
S
M1M2
S
TB5
C
C
A
Terminal block for indoor transmission cable
B
Terminal block for outdoor transmission cable
C
Remote controller
B
2
1
S
M2
Non-polarized
A
A
TB15
B
Remote Controller
C
DC24~30V
TB5
D
C
1 2
(A, B)
A
D
D
E
E
To prevent external tensile force from applying to the
wiring connection section of power source terminal
block use buffer bushing like PG connection or the like.
Power source wiring
Tensile force
Use ordinary bushing
Transmission wiring
5

Publicité

Table des Matières
loading

Table des Matières