Waeco AirConServiceCenter ASC5100G Notice D'utilisation page 93

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 171
ASC 5100G
8.8.4
Selecting connections
1. Select the parameters in accordance with the air conditioning system
connections:
– Air conditioning system has a high pressure and a low pressure
connection:
Select LP/HP.
– Air conditioning system only has a high pressure connection:
Select HP.
– Air conditioning system only has a low pressure connection:
Select LP.
2. Press ENTER to confirm.
3. Once all settings have been entered, press ENTER to start the
process.
8.8.5
After ending the air conditioning service
✓ After the air conditioning service has finished, you are prompted to
disconnect the hoses of the AirCon Service Center from the vehicle air
conditioning system.
1. Disconnect the service hoses (7) and (8) and press ENTER to con-
firm.
✓ The service hoses will now be drained. The unit is then ready for
further use.
2. Screw the valve caps of the air conditioning system back on the
connections.
EN
HP/LP
HP
LP
ENTER-OK STOP-EXIT
Process start?
ENTER-OK STOP-EXIT
PORT
PORT
PORT
Operation
93

Publicité

Table des Matières
loading

Table des Matières