Blackstone 1565 Guide Du Propriétaire page 16

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STEP 6: With help, place the iron Griddle Top on the
top of the fire box. Peg legs on the bottom of the Griddle
will line up with docking holes in the top of the appliance
body (as shown in Diagram G).
STEP 7: Hang the Oil Cup on the backside of the
Griddle top (as shown in Diagram H).
Oil Cup (1 pc)
STEP 8: Install the Cylinder upper hanger and lower
fastener with two(2) M6x38 bolts and two(2) M6 Nuts
(as shown below in Diagram I).
Two(2) M6x38 Bolts
STEP 9:
Hang up the LP Gas Tank on the latch (as shown in Diagram J).
Diagram I
16
www.blackstoneproducts.com
ASSEMBLY CONT.
Two(2) M6 Nuts
Diagram G
Diagram H
Diagram J

Publicité

Chapitres

Table des Matières
loading

Table des Matières