Paste contRol RolleR installation
anD aDjustMent
Insert the paste control roller ends in the paste tank holes and lock the bushings (#832) in place with
the retaining ring (#441)
Set the roller clearance as follows:
1. Facing the side of the tank, hold the bushing with your fingers and turn so shaft is upwards towards
the paste roller (#1659)
2. Now turn the bushing in the opposite direction and using a feeler gauge set clearance to between
.002" and .004". Make this adjustment on each end of the adjusting roller.
3. Position the adjusting lever (#834) against bushing (#832) with pin hole, and check that the slotted
holes in lever match screw holes in bushing. You might have to turn the bushing slightly. If so reset
bushing on the other side to match.
4. Fasten slotted levers to the bushings on each end with 4 (#2) lock washers and 4 (#38) screws.
5. Re-check roller clearance from end to end with lever in pin hole #1 (closed) position.
Left
Facing the machine, looking over the material
bar views left and right sides.
#38
#832
Center hole is offset to the
center of the bushing.
FRONT
PAPER
Right
#634
Eccentric hole of bushing should be up and
forward to paste roller in closed position.
advance-equipment.com
MeasuRing counteR oPeRation
Counter base is attached to the guide stay shaft and measuring counter is placed on the pasted mate-
rial reversed by the reverse feed roller. Pull out the pasted material until the cut line (Fig. 7) and lift the
red reset lever of the measuring counter, and it will show "0000." Then pull out the material to paste, as
you are reading the numbers on the counter. You can read the length of the pasted material in "Inches."
Fig. 7
measuring counter
cut line
material
Measuring Counter No. 51114
guide stay shaft
counter wheel
Page 9