LIFAN Power USA STORM Série Mode D'emploi page 17

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Pre-­‐Operating   I nstructions:   G enerator   S etup  
CAUTION:     A ny   a ttempt   t o   s tart   t he   g enerator   b efore   i t   h as   b een   p roperly   s erviced   m ay  
result   i n   e ngine   f ailure   a nd   v oid   w arranty.  
 
CHECK   A IR   C LEANER   E LEMENT:
1. Remove   t he   M aintenance   A ccess   C over.   ( Refer   t o   C ontrols   a nd   F eatures   s ection).  
2. Remove   t he   A ir   C leaner   C ase.  
3. Pull   o ut   t he   A ir   C leaner   C artridge,   f ollowing   t he   d irection   o f   t he   a rrow.  
4. Check   t he   c leanliness   o f   t he   A ir   C leaner   E lement.  
5. Clean/Replace   i f   n eeded.  
6. Reinstall   t he   A ir   C leaner   E lement.  
7. Reinstall   t he   A ir   C leaner   C ase.  
8. Reinstall   t he   M aintenance   A ccess   C over.  
 
 
 
 
 
 
 
 
 
 
 
    R efer   t o   d iagram   b elow.  
 
16  
LIFAN   P ower   U SA  
2205   I ndustrial   P ark   R oad  
Van   B uren,   A R   7 2956  
866-­‐471-­‐7464  
www.lifanpowerusa.com  

Publicité

Table des Matières
loading

Table des Matières