Pre-‐Operating
I nstructions:
A ssembly
UNPACKING
T HE
G ENERATOR
A ND
I NSTALLING
W HEELS:
(ESI2000iER
&
E SI2600iER
M odels
O nly)
1. Set
t he
C arton
o n
a
F lat,
R igid
S urface.
2. Open
t he
t op
o f
t he
c arton.
3. Place
a ll
l oose
i tems
o n
t he
g round
n ext
t o
t he
c arton.
4. Carefully
l ift
t he
G enerator
o ut
o f
t he
o pened
c arton
a nd
o nto
t he
F lat,
R igid
Surface.
5. Carefully
l ay
t he
g enerator
o n
i ts
s ide
a nd
r emove
t he
p rotective
f oam
h alf.
6. Install
W heel
b y
s liding
o nto
a xle.
7. Slide
w asher
o nto
a xle.
8. Secure
W heel
a nd
w asher
b y
i nserting
C otter
P in
t hrough
h ole
o n
a xle
a nd
bending
e ach
e dge
o f
t he
C otter
P in.
9. Install
w heel
c over
( if
p rovided)
b y
p ressing
t he
w heel
c over
o nto
t he
w heel
u ntil
the
w heel
c over
s naps
i nto
p lace.
10. Carefully
f lip
t he
g enerator
1 80
d egrees
a nd
r emove
t he
o ther
p rotective
f oam
half.
11. Install
W heel
b y
s liding
o nto
a xle.
12. Slide
w asher
o nto
a xle.
13. Secure
W heel
a nd
w asher
b y
i nserting
C otter
P in
t hrough
h ole
o n
a xle
a nd
bending
e ach
e dge
o f
t he
C otter
P in.
14. Install
w heel
c over
( if
p rovided)
b y
p ressing
t he
w heel
c over
o nto
t he
w heel
u ntil
the
w heel
c over
s naps
i nto
p lace.
15. Carefully
s et
t he
g enerator
u pright.
(continued)
13
LIFAN
P ower
U SA
2205
I ndustrial
P ark
R oad
Van
B uren,
A R
7 2956
866-‐471-‐7464
www.lifanpowerusa.com