The thermodynamic generators AQUACIAT Series ILZHE air/
water are outdoor packaged units equipped in series with :
– Low sound level compressor.
– Brazed plates exchanger.
– Air-cooled condenser.
– Propeller fan(s) with speed variation in cooling mode.
– Buffer capacity (ILZHE only).
– Electrical auxiliary device (ILZHE only).
– Hydraulic accessories.
– Complete MRS5.1 electronic control.
They are tested and checked in factory and delivered with a
load of R407C.

Receiving the material

Check the unit and conformity of delivery on arrival on site.
In case of damaged unit or uncomplete delivery, note discrep-
ancies on the delivery voucher.
IMPORTANT : you must confirm your reservations by regis-
tered letter to the shipping agent within the 3 days following
delivery.

Identifying the material

Each unit has a manufacturer's data plate with an identification
number.
This number is to be quoted in all correspondance.

Guarantee

The duration of the guarantee is 12 months, starting from the
date of commissioning, which must be carried out within the 3
months following the invoicing date.
In all other cases, its duration is 15 months from the invoicing
date.
When the commissioning is carried out by CIAT or a CIAT
approved technician, the guarantee covers totally the parts, the
refrigerant and electrical circuits, working hours and travelling,
each time the fault is attributable to CIAT or its material.
When the commissioning is not carried out by CIAT, the guaran-
tee only covers the defective parts as well as the refrigerant and
electrical circuits assembled in factory, except if the recognized
fault is not attributable to the manufacturer.
Installation garden
Note : for further information, refer to the CIAT guarantee exer-
cise.

Safety recommendations

In order to avoid all risks of accident during the installation, com-
missioning and adjustment operations, it is imperative to take
into consideration the specificities of material, such as :
– refrigerant circuit under pressure
– presence of refrigerant fluid
– presence of voltage
– siting
Only qualified and experienced personnel should work on such
equipment. Recommendations and instructions mentioned on
the maintenance brochures, stickers or specific instructions
must be respected.
Conform to norms and regulations in force.
IMPORTANT : before working on the unit, make sure that the
electrical supply is cut.

Siting of unit

Before handling, positioning and connecting the unit, the
installer will check the following points :
– These units are to be installed outside, in the vicinity of the
building, on a terrace or in a garden.
They are designed for operating under the rain, but can also be
installed under a shelter, open on 4 sides.
If more heating than cooling is planned, siting privileging the
sun will be preferable. If little heating is planned, adopt a north-
ern orientation.
– The surface of the ground or structure will be resistant enough
to support the weight of the unit.
– Position the unit above the average snow height of the area
where the group is to be installed.
– The unit must be perfectly level.
– The group must be perfectly accessable for ease in carrying
out maintenance and servicing operations.
– No obstacle should impede the free circulation of air on the air
exchanger (intake and discharge).
Sound level : our units have been designed for a low sound
level operation. However, when planning the installation, take
into consideration the outside environment and the type of
building for radiated and transmitted noise (vibrations).
If need be, ask for a sound technician's assessment.